I'AM ON
  • Proven Hot & Cold Water Performance
  • Self-extinguishing. does not Support Combustion
  • Lower Thermal Conductivity
  • No Bacterial Growth Compared to other Piping Material
  • UV Resistance
SMARTFIT CPVC Plumbing system is designed for Hot & Cold water which is suitable for all plumbing and potable water application. It has a proven hot & cold water performance from 0° C to 93°C. Its corrosion resistance property makes it usable in all weather & ensures constant flow over lifetime. This system is used in industrial, residential, commercial & public complexes.

Prince Pipes offers cost-effective and versatile lead-free CPVC pipes and UPVC pipes. CPVC Pipes are a great alternative solution to GI (galvanized iron) pipes and our comprehensive range of CPVC pipes and fittings will fulfil your every demanding application.

Pipes

Standard packing material – SDR 11

Standard packing material – SDR 13.5

Standard packing material – SCH 40

Standard packing material – SCH 80

Fittings

Brass Insert Fittings

  • mta heavy cpvc pipe fitting

    M.T.A (Heavy)

  • M.T.A

  • fta heavy cpvc pipe fitting

    F.T.A (Heavy)

  • F.T.A

  • ft elbow cpvc pipe fitting

    F.T Elbow

  • ft tee cpvc pipe fitting

    F.T Tee

  • ball valve cpvc pipe fitting

    Ball Valves (Union Type)

  • metal camp cpvc pipe fitting

    Metal Clamp (Powder Coated)

Fittings

  • coupler cpvc pipe fitting

    Coupler

  • elbow cpvc pipe fitting

    Elbow

  • elbow 45 cpvc pipe fitting

    Elbow 45°

  • tee cpvc pipe fitting

    Tee

  • union cpvc pipe fitting

    Union

  • end cap cpvc pipe fitting

    End Cap

  • four tee cpvc pipe fitting

    Four Way Tee

  • cross over cpvc pipe fitting

    Cross Over

  • fta cpvc pipe fitting

    F.T.A

  • mta cpvc pipe fitting

    M.T.A

  • tank connector cpvc pipe fitting

    Tank Connector

  • reducer cpvc pipe fitting

    Reducer

  • reducer bush cpvc pipe fitting

    Reducing Bush

  • reducing elbow cpvc pipe fitting

    Reducing Elbow

  • reducing tee cpvc pipe fitting

    Reducing Tee

  • reducing mta cpvc pipe fitting

    Reducing M.T.A

  • transition bush cpvc pipe fitting

    Transition Bush

Solvents

Solvent Cement

  • Tin

  • Tube

Specifications

Jointing Method

Process: Solvent Joint
DO'S
  • CUTTING

    It is imperative to mark the pipe from all sides so that pipe is cut with the help of a hand saw. It should be a right angle cut from all the sides. The cut piece should not be with burr on edge.

  • CHAMFERING

    After cutting, the pipe needs to be chamfered from the outer sides. It is advisable to provide approximately 2mm wide,150 chamfer on spigot end.

  • DEBURRING AND RIDGE REMOVAL

    Remove all the burrs and ridges accumulated on the inner as well as the outer edges of the pipe with the help of a deburring knife, file or abrasive paper.

  • DRYFIT TEST

    Before applying solvent cement, insert the pipe end into the socket of the next pipe or fitting to check that interference occurs at about 1/3 to 2/3 of the socket depth.

  • CLEANING

    Thoroughly clean the pipe with dry cloth where the solvent cement is going to be applied to avoid dust, dirt, oil, moisture and other foreign materials during the installation process.

  • APPLICATION OF SOLVENT CEMENT

    Mark the pipe length to be inserted for jointing.
    Apply a liberal coat of solvent cement with the help of the brush on the marked surface.

  • JOINTING

    Push the pipe inside the fitting / pipe so that it goes inside equally from all the sides. Wipe off excess solvent cement that comes out from all the edges. Hold the joint for one to two minutes so that the jointing is perfect.

  • INSTALLATION AND COMMISSIONING

    Pressure testing may be carried out after a curing period of 24 hrs.

DONT'S
  • CUTTING

    Do not cut/slantunevenly.

  • CHAMFERING

    Do not proceed with installation of pipe without chamfering.

  • DEBURRING AND RIDGE REMOVAL

    Do not proceed with installation of pipe without deburring.

  • DRYFIT TEST

    Do not apply solvent cement without dryfit test.

  • CLEANING

    Do not join the pipes without cleaning the pipe ends.

  • APPLICATION OF SOLVENT CEMENT

    Do not apply excess solvent cement on the pipe and do not use solvent cement by hand.

  • JOINTING

    Do not use a hammer or half push the pipe.

  • INSTALLATION AND COMMISSIONING

    Pressure testing should not be done before 24 hrs of curing.

Jointing Method Video

For Sales Enquiry